Lock Gates and Bridge for Ship Locks 4-5-6 Zuid-Willemsvaart
July 2010 - Veghel/Keldonk/Beek en Donk, The Netherlands
Design and construction of new lock gates and a movable bridge.
July 2010 - Veghel/Keldonk/Beek en Donk, The Netherlands
Design and construction of new lock gates and a movable bridge.
June 2009 - Tiel, The Netherlands
Renovation of ship lock complex.
April 2008 - Weurt, The Netherlands
Renovation of ship lock and existing lifting bridge. Design and construct of new lifting bridge and new cable drives for both lifting bridges.
November 2007 - Wijk bij Duurstede, The Netherlands
Renewal mechanical systems, ship lock doors, hydraulics and E&I of ship lock complex 'Prinses Irenesluizen'.
July 2007 - Wilhelmshaven, Germany
HSM Steel Structures designed, built and installed the new fifth sliding door for the ‘Große Seeschleuse’ at Wilhelmshaven, Germany.
January 1998 - Nieuwegein, The Netherlands
Renovation of lock ’Koninginnesluis’.
May 1997 - Hoek van Holland, The Netherlands
Storm Surge Barrier ’Nieuwe Waterweg’ (Maeslantkering). Two huge floating barriers of steel to protect Rotterdam and the hinterland.